Now showing items 1-3 of 3

    • Implementing Zimbabwean projects in the Zambezi Valley 

      Tumbare, M. J. (Zimbabwe Institution of Engineers, 2013-12)
      Projects such as the Kazungula-Kasane Bridge, Victoria Falls North Bank Power Station, Hwange 7 and 8 Thermal Power Station Extension, Batoka Gorge Hydro-electric Scheme, Zambezi-Bulawayo Water Supply Scheme, Devil's Gorge ...
    • Improved flood estimation model for bridge and culvert design in Zimbabwe 

      Mamombe, L; Tumbare, M. J. (Zimbabwe Institution of Engineers, 2016-02)
      Economics and risk minimization in the design of infrastructure that is vulnerable to flood damage often prove to be non-commensurate objectives. To economically minimize the risk of hydraulic failure of this type of ...
    • Water insecurity in Zimbabwe’s towns and cities: Challenge for institutions 

      Makurira, H.; Tumbare, M. J. (Zimbabwe Institution of Engineers, 2014-11)
      There is widespread concern over water insecurity in most towns and cities in Zimbabwe. Some households have gone for years without receiving water yet most reservoirs supplying such towns or cities have been recording ...