Now showing items 1-2 of 2

    • Implementing Zimbabwean projects in the Zambezi Valley 

      Tumbare, M. J. (Zimbabwe Institution of Engineers, 2013-12)
      Projects such as the Kazungula-Kasane Bridge, Victoria Falls North Bank Power Station, Hwange 7 and 8 Thermal Power Station Extension, Batoka Gorge Hydro-electric Scheme, Zambezi-Bulawayo Water Supply Scheme, Devil's Gorge ...
    • Improved flood estimation model for bridge and culvert design in Zimbabwe 

      Mamombe, L; Tumbare, M. J. (Zimbabwe Institution of Engineers, 2016-02)
      Economics and risk minimization in the design of infrastructure that is vulnerable to flood damage often prove to be non-commensurate objectives. To economically minimize the risk of hydraulic failure of this type of ...