Search
Now showing items 1-2 of 2
An analysis of the Cahora Bassa Dam Water Balance and Reservoir Operations and their Flooding Impact on Upstream Settlements
(2012-07-17)
The Lower Middle Zambezi catchment is sandwiched between three major dams; Kariba,
Kafue (Itezhi-tezhi) and Cahora Bassa. The upstream dams have an impact on the inflows in
the downstream Cahora Bassa Dam and, also, on ...
A flexible computer based irrigation control system
(2012-09-13)
The project seeks to investigate the possibility of efficient water use in irrigation scheduling systems through the use of a designed flexible computer based irrigation control system. One of the specific objectives of ...