Please use this identifier to cite or link to this item: https://hdl.handle.net/10646/4406
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKanyira, Elvis-
dc.date.accessioned2022-04-12T07:25:57Z-
dc.date.available2022-04-12T07:25:57Z-
dc.date.issued2019-11-
dc.identifier.citationKanyira, Elvis. (2019).Non-legal effects of SI142 of 2019 on construction projects contract performance. [Unpublished masters theses]. University of Zimbabwe.en_ZW
dc.identifier.urihttps://hdl.handle.net/10646/4406-
dc.description.abstractAfter the introduction of SI142 of 2019 there has been a decline in construction projects success. The goal of this quantitative, correlational study was to critically analyze non-legal factors affecting implementation of construction projects success in Zimbabwe, case of Zimbabwe Power Company Hwange Expansion Project. The study sought to outline the critical factors that may be addressed to improve performance of construction project. In an effort to address the outlined problem above mentioned, the research adopted a quantitative approach in which population of this study was identified as personnel working on Hwange Expansion Project, both technical and non-technical and a sample was drawn from this population. Stratified random sampling method was used to select respondents to a pilot tested structured questionnaire with the assistance of the researcher in some instances. The data responses from these questionnaires were then analyzed using data analysis methods such as regression analysis and correlation analysis into findings that were used for further analysis, interrogation and recommendations. Conclusions were deduced from these findings leading to the formulation of recommendations. The study recommended that the key stakeholders should consider Material Availability, Project Funding, Technological Transfer and Employee Motivation as key to projects success.en_ZW
dc.language.isoenen_ZW
dc.publisherUniversity of Zimbabween_ZW
dc.subjectnon-legal factors affecting implementation of constructionen_ZW
dc.subjectZimbabwe Power Company Hwange Expansionen_ZW
dc.subjectperformance of construction project.en_ZW
dc.titleNon-legal effects of SI142 of 2019 on construction projects contract performance.en_ZW
dc.typeThesisen_ZW
Appears in Collections:Faculty of Business Management Sciences and Economics e-Theses Collection

Files in This Item:
File Description SizeFormat 
KANYIRA_Non_legal_effects_on_S1142_of_2019.pdf1.66 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.